Beckton Control Centre
Overview
- Contract name:
- Beckton Control Centre
- Client:
- Docklands Light Railway Limited
- Duration period:
- 9 months
- Form of contract:
- JCT with Design Portion
- Value:
- £4.5m
- Type of work:
- Capital Works
In preparation for the 2012 Olympic Games DLR commissioned the construction of a 2-storey Control Centre at Beckton to ensure the rail service remains operational in the event of a major incident. Cleshar undertook the construction and fit out of a Control Centre in East London for Docklands Light Railway as part of their expansion plan of the DLR Network.
A 3-phased sequential handover enabled early installation of clients bespoke services.