Beckton Control Centre

Download PDF

Overview

  • Contract name:
  • Beckton Control Centre
  • Client:
  • Docklands Light Railway Limited
  • Duration period:
  • 9 months
  • Form of contract:
  • JCT with Design Portion
  • Value:
  • £4.5m
  • Type of work:
  • Capital Works
Beckton Control CentrebecktonMan in MEWPArc WeldingPlacing Concrete

In preparation for the 2012 Olympic Games DLR commissioned the construction of a 2-storey Control Centre at Beckton to ensure the rail service remains operational in the event of a major incident. Cleshar undertook the construction and fit out of a Control Centre in East London for Docklands Light Railway as part of their expansion plan of the DLR Network.

A 3-phased sequential handover enabled early installation of clients bespoke services.