Hainault to Fairlop Embankment Stabilisation Works

Download PDF

Overview

  • Contract name:
  • Hainault to Fairlop Embankment Stabilisation Works
  • Client:
  • Transport for London (LUL Nominee BCV Ltd)
  • Duration period:
  • 6 Months
  • Form of contract:
  • NEC Option A
  • Value:
  • £850,000
  • Type of work:
  • Infrastructure Maintenance
cable route HainaultHainault

This project provided LUL the upgrade of the Hainault to Fairlop Embankment to current engineering standards. The stabilisation works involved piling, reinforced concrete and track monitoring to ensure safe traffic conditions as the majority of works were carried out during traffic hours.